Downtown Footbridge Rehabilitation 

 Location Footbridge over Moira River at Catharine St.
 Project Estimate $700,000-$1.2M Other options to be investigated
 Extent of Work After an initial tender process the cost of constructing a new bridge or repairing the existing structure is now known. At this point $25,000 will be utilized to determine what additional options may be included in the project. Widening the walkway to 3 meters to match the width of the Riverfront Trail system and illumination of the footbridge are features being considered. After determining these extra costs it can then be decided if the footbridge should be rehabilitated or replaced.
 Commencing

Summer 2011

 Complete Fall 2011

 

Skip navigation links
Building
Engineering Studies
Capital Construction Projects



   
Terms of Use
Privacy Statement
Disclaimer
  City of Belleville .  169 Front Street, Belleville, Ontario, Canada K8N 2Y8 . 613-968-6481
Residents
Business
Visitors
City Hall
City of Belleville Background Footer